|
FAQ #14
If an encounter has more than one qualifying risk element, which level of risk do I choose?
Answer: The overall level of risk is determined by the highest element of risk present. This is explicitly stated in the E/M guidelines as follows:
"The highest level of risk
in any one category (presenting problem(s), diagnostic procedure(s), or management options)
determines the overall risk."
1995 E/M guidelines: p. 13. 1997 E/M guidelines: p. 51 |